Luke James
•
June 10, 2026
•
June 10, 2026
Besides Samsung Heavy, Japan’s MOL is also building a 73 MW floating data center with Karpowership for a 2027 deployment.
Besides Samsung Heavy, Japan’s MOL is also building a 73 MW floating data center with Karpowership for a 2027 deployment.